Sydney Gateway Professional Services Rail Duplication & Services Investigation
Case study
Client: RMS
Timing: 2018
Value: $1.2M
Services: 150
Background & scope
As part of the road upgrades and rail duplication project in the Sydney Gateway Project area, Infraworks were consulted by the NSW Government to play a key role in the production of a 3D (SUI quality level ‘A’) utility locations survey.
This involved locating and surveying the underground services at 150 localities, performed through NDD Potholing and positive location of services.
Our approach
Infraworks took on the role of ‘principal contractor’, with the Infraworks project management team responsible for the development and implementation of all safe systems of work and coordination of project activities.
To best prepare for the challenging conditions of each location, Infraworks performed an evaluation and subsequently grouped each location into respective categories based on safety requirements and type of utility.
With the evaluation complete, the planning and coordination phase began. This phase took into special consideration the availability of the service owner’s representatives, Rail Track possessions and ROL’s (Road Occupancy Licences).
Clear communication and coordination of activities with the service owners was crucial to the success of the project. Infraworks worked closely with key parties to ensure each service owner was notified in advance of the works planned near their assets and all required approvals were sought in order to stay on schedule.


Snapshot of works undertaken
Project management, HSE, and rail safety

Provision and implementation of all Safety, Quality and Environmental (SQE) plans.

Provision of baseline schedule and forecasting information.

Provision and presentation of Project Reporting on SQE, Progress Tracking Forecasting, change control, risk management.

Participation in quality system audits.

Participation in on-site inspections.
Potholing and surveying

Provision of qualified surveyors.

Location of all utilities using NDT techniques and 3D surveying.

Provision of authorised traffic controllers.

Survey utility location and depth.

Leaving a clean worksite and removing from all waste products from site.
Survey outputs

Assigning qualified surveyors.

Updating the 3D Utility model.

Update the Port Botany Rail Link Duplication Services Impact Schedule.

Plans supplied in dwg and pdf format and updated DSS.
Site mobilisation

Provision and management of all equipment and personnel resources.

Providing all vehicles and mobile equipment including sucker trucks, dumpers, tilt trays, water carts, support vehicles etc.

Provision of temporary track access ramps.

Do you have an upcoming project?
Infraworks are experts in the infrastructure, manufacturing, transport and logistics sectors. With over two decades of experience in delivering comprehensive and high-value services for our clients, our work spans from large-scale civil engineering projects through to remote works, with the ability to mobilise resources to any location across Australia.
Contact the expert team for assistance with all of your upcoming project needs.

Curious about the full list of ways we can help your next project?
Our clients value us for our large-scale capabilities and ability to provide comprehensive services to the Australian heavy infrastructure, maintenance, manufacturing and transport industries.
To find out more about how we can help deliver your next project, view our Corporate Profile below.

Get in touch
Feel free to contact us for any further information about our Infraworks services.